Skip to content
No.19, Xingliang Road, Hecheng Street, Gaoming District, Foshan, China +86-13425703089  · manager@ouyigang.com

No.4 Buffing Machine

OUYIGANG No.4 Buffing Machine. Plate thickness (mm): 0.4~3.0; Plate width (mm): 1250; Speed (m/min): 6~60. Custom engineering, CE certified, global installation

No.4 Buffing Machine

Technical specifications

Plate thickness (mm)0.4~3.0
Plate width (mm)1250
Speed (m/min)6~60
Coil outer diameter (mm)1900
Coil inner diameter (mm)508 (610)
Uncoil bearing (T)22
Length of production line (mm)37
The total power unit (KW)465

For processors running stainless steel coil in coil form, this line produces a repeatable No.4 satin finish at production speed. The buffing section is what turns a levelled surface into No.4 satin, cutting haze rather than stock. No.4 is the directional satin finish specified for elevator cabs, kitchen equipment and architectural cladding.

It handles work up to 37 long. The working envelope also covers coil inner diameter at 508 (610), so the surface stays within tolerance across the batch.

What This Machine Does

This buffing machine is configured for No.4 satin finish on stainless steel coil. The buffing section is what turns a levelled surface into No.4 satin, cutting haze rather than stock.

Working coil inner diameter on this machine is 508 (610).

As specified here — coil outer diameter 1900, plate width 1250, the total power unit 465, uncoil bearing 22.

Features

  • Entry and exit tables are powered, keeping the operator away from the nip points.
  • The control system stores recipes per grade and thickness, which shortens changeover between jobs.
  • Service access is from the front, so the machine can sit against a wall.
  • A central lubrication point serves the main bearings, cutting daily service to a few minutes.

Common Uses

  • hospital and laboratory cabinetry
  • manufacturers feeding a downstream forming line
  • handrails and trim sections
  • ventilation and duct components

Packing & Delivery

Standard export packing, container shipment, 30 days from deposit. Commissioning and operator training can be arranged after delivery.

FAQ

What sets the throughput of this machine?

Throughput follows the number of working stations, the width being processed and how far the surface has to be taken — reaching No.4 satin takes more passes than a coarse grind. The specification table above gives the working speed for this machine.

What is involved in installation?

The machine ships as a complete unit. Foundations, power supply and extraction are the buyer's scope; commissioning and operator training for No.4 satin work are carried out on site after installation.

Other models in this family

2