Skip to content
No.19, Xingliang Road, Hecheng Street, Gaoming District, Foshan, China +86-13425703089  · manager@ouyigang.com

NO.8 Buffing machine for Stainless Steel Coil

OUYIGANG NO.8 Buffing machine for Stainless Steel Coil. Processing Width (mm): 1000~1550 max; Feeding speed (m/min): 1.5; Coil thickness (mm): 0.3~2.0.

NO.8 Buffing machine for Stainless Steel Coil

Technical specifications

Processing Width (mm)1000~1550 max
Feeding speed (m/min)1.5
Coil thickness (mm)0.3~2.0
Sheet thickness (mm)0.6~3.0
Grade of sheetJIS200,300 series

Continuous processing means stainless steel coil reaches No.8 / 8K super mirror finish without the stop-start marks that show on batch machines. The buffing section is what turns a levelled surface into 8K mirror, cutting haze rather than stock. Super mirror (8K / No.8) is the top of the range, specified where the panel has to be genuinely reflective.

It takes stock from 0.3~2.0 in thickness. The working envelope also covers sheet thickness at 0.6~3.0, so the surface stays within tolerance across the batch.

How It Works

This buffing machine is configured for No.8 / 8K super mirror finish on stainless steel coil. Cloth wheels and compound do the final work, lifting the surface to 8K mirror after the abrasive stations have levelled it.

Line speed is set at 1.5, depending on the finish required.

This build runs to processing Width 1000~1550 max and grade of sheet JIS200,300 series, with coil thickness 0.3~2.0 and feeding speed 1.5.

Features

  • The control system stores recipes per grade and thickness, which shortens changeover between jobs.
  • Heads are mounted on dovetail slides, so a station can be re-set without shimming.
  • Oil-type grinding carries the swarf away and keeps the abrasive cool, giving a cleaner surface on long runs.
  • The machine can be run in either direction, which helps when a panel has to be re-worked.

Common Uses

  • luxury shopfitting
  • decorative lift cabins
  • service centres processing coil to order
  • signage and lettering

Packing & Delivery

Standard export packing, container shipment, 30 days from deposit. Commissioning and operator training can be arranged after delivery.

FAQ

What is involved in installation?

The machine ships as a complete unit. Foundations, power supply and extraction are the buyer's scope; commissioning and operator training for 8K mirror work are carried out on site after installation.

Can it be reconfigured for a different finish later?

Yes. Changing the abrasive sequence, and the belt or compound grade, moves the machine between finishes on stainless steel coil. The frame and drive train stay as they are; only the consumables and the stored recipe change.

Other models in this family

2